Work Details 2008 We had a good turn out for our Adopt-A-Highway program and work details. For the outside restrooms we replaced the doors and lights and put up a privacy fence. On the Shelter House we installed new electrical circuits, lights and GFIC receptacles and did some major electrical repairs. The Shelter also got steel beams installed to brace the roof and it got painted. We also remove the old barbecue pit and the roof above it. We straightened up the parking blocks, cleaned out and mulched around the signs, did the front bushes and mowed the grass. We redid the Banquet Room hallway, bar corner and replaced the dish washer. We need to remove or repair the pole light by the dumpster and repair the flag light on the Monument. We need someone to do some concrete work to fill the hole left after removing the barbecue pit. If you can do it let us know. I want to thank everyone for their hard work. Check it all out the next time you're at the Post.
I still want more pictures of Post events. Or give them to me (Bob Swearingen) at the Post. Last Updated: December 8th, 2008 |